Project
-
Optimum Panel & Inverter Configuration (Array String Layout)
-
3D System Design and Sampling
-
Direction and Shadow Calculations
-
Static Project Drawing
-
Mechanical Project Drawing
-
Electrical Project Drawing (LV / MV / ENH)
-
Annual Sunshine and Production Simulation
engineering
-
Project Pre-feasibility
-
Solar Radiation Analysis
-
Detection of Dusting and Pollution Factors
-
Discovery of Shading Areas
-
Port and Distribution Transformer Compliance Check
Field Development
-
Field Development:
-
Coordinated Application
-
Geotechnical Study and Ground Survey
-
Excavation Works
-
Hammering Tensile Test
-
ROOF LOAD AND RESISTANCE TESTS
-
Project Area Security Works (Fence, Wire Mesh, Camera, etc.)
Project Implementation EPC
-
Lightning Protection and Grounding System Work
-
Installation of the Carrier System
-
PV Panel Mounting
-
Inverter and Panel Mounting
-
DC/AC Wiring and Connection Application
-
Engine Control Center (MCC) Installation and Commissioning
-
OG Infrastructure
-
Tests and Commissioning